Comparative review of robot work

Comparison premise: Manual work and economic analysis of DH-ROBOT work
External sales area: (135 x 14 x (4 x Yanghyeon)) x 0.7 = 10,584㎡ after blasting with SA2.5 or higher grade, conditions before painting once For both manual and robotic tasks, the actual working time of the 8 hours daily regular working hours is considered 6 hours (total 2 hours of work preparation/cleaning/rest)

Process Manual Work(A) Robot Work (B) Efficiency
[(B)-(A)]
Note
(Area of 10,584㎡) Equipment Process Require(A) Equipment Process Require(B)
High-Pressure Water Cleaning High-Pressure Pump/Nozzle 400 ㎡/hr/man 26.5 hrs High-Pressure Pump/Nozzle 400 ㎡/hr/man 26.5hrs 0.0 Salt Cleaning
Combustion Blasting Hand Blasting/Nozzle 10 ㎡/hr/man 1,058 hrs One Robot 36 ㎡/hr/2-man
(80% of total area)
470Hrs -588 hrs Administrator Separately
Hand Blasting/Nozzle 10 ㎡/hr/man
(20% of total area)
211hrs -211 hrs Perform the Non-Robotic Parts Manually
Grit Collection
(Total weight injection amount of grit 800 tons)
Vacuum Pump/Hose 3 Ton/hr/man-270hrs Vacuum Pump/Hose 3 Ton/hr/man-270 hrs
(160 tons of total scattering)
54hrs -216 hrs The robot system automatically retrieves grit & reuse
Air Cleaning Air Compressor/Hose 400㎡/hr/man 26.5 hrs Air Compressor/Hose 400 ㎡/hr/man
(20% of the total area)
6.0hrs -20.5 hrs
Surface Treatment Inspection Presence of a Prosecutor 500㎡/hr/3man 63.5 hrs Presence of a Prosecutor 500 ㎡/hr/3man
(전체 면적의 20%)
13.0hrs -592 hrs Realization of non-inspection of the robot working part
Total direct airlift 1444.5 hrs
(241 people required)
780.5hrs
(130 people required)
-664 hrs Separate review of expenses such as the installation and demolition costs of the complaint car and the chief
Combustion Material Consumption consumes about 800 tons
(C/Slug dispose after one use)
110,000 won/ton 88 million won 40 tons of consumption
(S/Grit 800-ton spray small and medium-sized capability expected to be about 5%)
A million won/ton Spending 40 million won Reduce costs by about 55% for combustion materials